![Dell EMC Vblock 240 Administration Manual Download Page 56](http://html1.mh-extra.com/html/dell-emc/vblock-240/vblock-240_administration-manual_2468384056.webp)
8
To install the new Cisco NX-OS images, type
install all kickstart bootflash:n5000-
uk9-kickstart.5.0.3.N1.1c.bin system bootflash:n5000-
uk9.5.0.3.N1.1c.bin
To view the progress of the installation during the installation process, type
show install
all
. As the system performs the installation, it displays status messages like the following:
Verifying image bootflash:/n5000-uk9-kickstart.5.0.3.N1.1c.bin for boot variable
"kickstart". [####################] 100% -- SUCCESS
Verifying image bootflash:/n5000-uk9.5.0.3.N1.1c.bin for boot variable "system".
[####################] 100% -- SUCCESS
Verifying image type. [####################] 100% -- SUCCESS
Extracting "system" version from image bootflash:/n3000-uk9.5.0.3.N1.1c.bin.
[####################]
100% -- SUCCESS
Extracting "kickstart" version from image bootflash:/n3000-uk9-kickstart.5.0.3.N
1.1c.bin.
[####################] 100% -- SUCCESS
Extracting "bios" version from image bootflash:/n3000-uk9.5.0.3.N1.1c.bin.
[####################] 100% -- SUCCESS
Performing module support checks.
[####################] 100% -- SUCCESS
Notifying services about system upgrade.
[####################] 100% -- SUCCESS
Compatibility check is done:
Module bootable Impact Install-type Reason
------ -------- -------------- ------------ ------
1 yes disruptive reset STP ISSU preupgrade check failed
- Upgrade needs to be disruptive!
Images will be upgraded according to following table:
Module Image Running-Version New-Version Upg-Required
------ ---------- ---------------------- ---------------------- ------------
1 system 5.0(2)N2(1) 5.0(3)N1(1c) yes
1 kickstart 5.0(2)N2(1) 5.0(3)N1(1c) yes
1 bios v1.8.0(10/06/2010) v3.5.0(02/03/2011) yes
1 power-seq v3.0 v3.0 no
2 power-seq v1.0 v1.0 no
1 uC v1.1.0.1 v1.0.0.14 no
Additional info for this installation:
--------------------------------------
Port: port-channel52 in VLAN0001 is Designated. Topology change could occur during
ISSU.
Upgrade needs to be disruptive!!!
If you are performing a disruptive upgrade, the following warning appears:
Switch will be reloaded for disruptive upgrade.
Do you want to continue with the installation (y/n)? [n] y
Install is in progress, please wait.
Performing runtime checks.
[####################] 100% -- SUCCESS
Setting boot variables.
[####################] 100% -- SUCCESS
Performing configuration copy.
[####################] 100% -- SUCCESS
Module 1: Refreshing compact flash and upgrading bios/loader/bootrom/power-seq.
Warning: please do not remove or power off the module at this time.
Note: Power-seq upgrade needs a power-cycle to take into effect.
On success of power-seq upgrade, SWITCH OFF THE POWER to the system and then, power
it up.
Note: Micro-controller upgrade needs a power-cycle to take into effect.
On success of micro-controller upgrade, SWITCH OFF THE POWER to the system and then,
power it up.
[####################] 100% -- SUCCESS
Finishing the upgrade, switch will reboot in 10 seconds.
Managing networking resources
|
56