AP Blot - SERVICE MANUAL
SECTION 3
MAINTENANCE PROCEDURES
Doc. N° MDS-AP-26-00-02
Rev.01
Date: 02.04.2009
Page 42
3.4.4.7.
Substituting INTEROP2 PCB (Y-axis movement)
a) Undo fixing screws to remove device top cover
b) Detach connectors from INTEROP2 PCB and remove 4 fixing screws.
c) Reposition new PCB and secure it with 4 fixing screws.
d) Reinsert connectors.
e) Check Y-axis centering
f)
Check Z maximum value.
g) Reposition cover and screw back screws
2 fixing screws
2 fixing screws