AP Blot - SERVICE MANUAL
SECTION 3
MAINTENANCE PROCEDURES
Doc. N° MDS-AP-26-00-02
Rev.01
Date: 02.04.2009
Page 41
3.4.4.4.
Substituting X-axis movement belt
a) Remove screws fixing instrument cover to remove cover.
b) Loosen 3 grub screws fixing both ends of belt.
c) Replace belt and then tighten 3 grub screws which fixed the 2 ends of belt.
d) Check that belt is correctly tightened.
e) Remount cover
3.4.4.5.
Substituting Flat Cables
a)
The flat cables are held in position by plastic cable holder bands.
b)
Remove PCB connectors 6
c)
Remove cable holder bands and gently pull out flat cable.
d)
Insert new flat cable and replace all previous cable holder bands.
e)
Carefully re-insert connectors in correct positions.
3.4.4.6.
Substituting X-Y axis movement flat cables
a) Remove device top cover after undoing top screws
b) Remove connectors between Y axis motor and AP22MOT PCB
c) Remove all plastic cable holder bands.
d) Remove cable blocking plates PIASTRINE CHE BLOCCANO I CAVI DI MOVIMENTO
e) Dismount INTERFA1 PCB from base of frame
f)
Remove black blocking plate and then undo 2 fixing screws from AP22MOT PCB
g)
After removing all remaining protection - replace chain with AP22MOT and INTERFA1 PCBs on each end
h) Remount new cable with PCBs and reposition all cable holder bands
i)
Remount cover
cable holder
bands
Cable blocking
Plate
AP22MOT PCB
INTERFA1 PCB
X-Y-axis
movement flat
cable
Cable blocking
Plate