Illustration 49: Connection Points for Mains to Input Power Option (Enclosed Drive Configured With Power Options Cabinet)
1
Factory cables connecting contactor to drive input
terminals
2
Upper cover
3
Lower cover
4
Input power terminals (disconnect option is shown)
5
Grounding bar
5.8.3 Connecting the Drive Module to the Motor
Procedure
Strip a section of the outer cable insulation.
Fasten a connector/cable lug to the end of the stripped cable.
Create an electrical connection between the cable shield and ground by securing the stripped wire under the cable clamp.
AQ357954340588en-000201 / 130R0881
84 | Danfoss A/S © 2020.09