118
AK2-SC 255 Reference Manual
RS.8D.M1.22
(levels) which you will allow to be shed when the
emergency generator is running.
Normal soft start begin level
[Demand limiting only](0 to the number of normal steps
set above, up to 10; if 8 normal steps are configured,
for example, the upper limit of this entry is 8) This
entry specifies the level down to which loads will be
turned on when the emergency generator starts. A
level will be added each minute unless the specified
emergency load for shedding to start is reached.
Coupling begin level
[Emergency generator control](0 to 99999) Enter the
upper demand limit you do not wish to exceed for the
given hour of the day under normal operating condi-
tions (when using normal power). There is one field for
each hour of the day, from 00 to 23.
This screen
has two pages in order to list all the hours of the day.
Emergency
Soft start begin level
[Emergency generator control](0 to the number of
emergency steps set above, up to 10; if 8 emergency
steps are configured, for example, the upper limit of
this entry is 8) This entry specifies the level down to
which loads will be turned on when the emergency
generator starts. A level will be added each minute
unless the specified emergency load for shedding to
start is reached.
Coupling begin level
[Emergency generator control](0 to 99999) Enter the
upper demand limit you do not wish to exceed for the
given hour of the day under normal operating condi-
tions (when using normal power). There is one field for
each hour of the day, from 00 to 23. This screen has
two pages in order to list all the hours of the day.
Wattnode Plus
configuration
When the meter being set up is a Wattnode Plus (Wn
Plus), there there is a second page to the setup screen.
Clicking on ‘“PG DN” for more’ at the bottom of the
first setup page will display the second page. On that
page, you will find the following additional fields to be
entered:
Power update: (0-60, default 5) The interval at which
power is measured.
Energy update: (0-60, default 5) The interval over
which energy (the integral of power over time) is
calculated.
Reactive update: (0-60, default 5) The interval over
which reactive components are recalculated.
Demand period: (5-720, default 15) The interval over
which demand is calculated. Demand is defined as
average power over a specified time interval.
Demand subintervals: (1-8, default 1) The number of
divisions of the demand period used when calculating a
Summary of Contents for AK2-SC 255
Page 1: ...REFRIGERATION AND AIR CONDITIONING AK2 SC 255 Reference Manual Users Manual...
Page 2: ...RS 8D M1 22 AK2 SC 255 Reference Manual 1 AK2 SC 255 Rack Controller System Reference Manual...
Page 3: ...2 AK2 SC 255 Reference Manual RS 8D M1 22...
Page 11: ...10 AK2 SC 255 Reference Manual RS 8D M1 22...
Page 157: ...156 AK2 SC 255 Reference Manual RS 8D M1 22...
Page 204: ...RS 8D M1 22 AK2 SC 255 Reference Manual 203...