Control
Specifications
for
full
PCB
control:
SK
‐
NCPDWH
‐
001b
~S
D.
Configuration:
Full
Control
PCB
Abbreviations
Ts
=
Setting
temperature
Tr
=
Room
air
temperature
Ti1
=
Chilled
water
coil
temperature
Ti2
=
Hot
water
coil
temperature
AUX1
=
Hot
water
free
contact
AUX2
=
Chilled
water
free
contact
MTV1
=
Chilled
water
valve
MTV2
=
Hot
water
valve
I/O
Port
Definitions
D.1.
I/O
Code
2
‐
Pipe
4
‐
Pipe
Analogue
Input
Room
Sensor
AI1
Return
air
temperature
(Tr)
Chilled
water
Sensor
AI2
Chilled
/
hot
water
coil
circuit
(Ti1)
Chilled
water
coil
circuit
(Ti1)
Hot
water
Sensor
AI3
N/A
Hot
water
coil
circuit
(Ti2)
Input
IR
receiver
X
‐
DIS
1
Digital
communication
port
to
LED
display/
IR
receiver
board.
Wired
wall
pad
TTL1
Digital
communication
port
to
wired
wall
‐
pad
board.
Digital
input
Occupancy
contact
PR1/PR2
This
contact
may
be
connected
to
occupancy
sensor
or
BMS
system.
DIP
‐
SWITCH
IS
ON.
(Window
contact)
The
contact
is
normally
open.
If
the
contact
has
been
closed
for
10
minutes,
the
unit
will
shut
down.
When
the
contact
is
open
again,
the
unit
restarts.
DIP
‐
SWITCH
IS
OFF.
(Economy
contact)
Cooling
operation
will
only
be
activated
when
Tr
‐
Ts
≥
4ºC.
If
Tr<Ts,
cool
operation
will
be
terminated.
Heating
operation
will
only
be
activated
when
Tr
‐
Ts
≤
‐
4ºC.
If
Tr>Ts,
heating
operation
will
be
terminated.
Float
switch
Float
Voltage
‐
free
(NC)
Electrical
heater
safety
switch
EH
Voltage
‐
free
(NC).
The
contact
is
closed
before
the
EH
is
turned
on.
Power
input
Phase
L
Power
supply
to
the
PCB
and
all
the
loads
connected
to
the
voltage
outputs.
Max
length:
5m.
Neutral
N
Power
supply
to
the
PCB
and
all
the
loads
connected
to
the
voltage
outputs.
Max
length:
5m.
Earth
GND
Power
supply
to
the
PCB
and
all
the
loads
connected
to
the
voltage
outputs.
Max
length:
5m.
Summary of Contents for FDLA-09
Page 1: ...SK2018 GLOBAL FDLA V P AC 001 FDLA V P AC MOTOR...
Page 27: ...Page 26 of 51 SK2018 GLOBAL FDLA V P AC 001 Configuration Settings...
Page 53: ...FDHD V P AC MOTOR...
Page 69: ...B 1 4 4 Electrical connections T Configuration standard version...
Page 74: ...Wiring Diagram D 2 SK NCPDWH 001b S Configuration Full Control PCB...
Page 76: ...Configuration Settings D 3...
Page 111: ......
Page 112: ...SK2019 FCSD H V P ECM 001 FCSD H V P ECM MOTOR...
Page 190: ...SK2019 FCSD H V P ECM 001...
Page 191: ...Page 1 of 59 SK2015 FMCD V EC 001 FMCD ECM MOTOR...
Page 210: ...Page 20 of 59 SK2015 SWC V EC 001 D 1 3 Wiring Diagram SK NCSWC 001...
Page 233: ...Page 43 of 59 SK2015 SWC V EC 001 D 4 2 Wiring diagram SK NCSWC 002...
Page 248: ...Page 58 of 59 SK2015 SWC V EC 001 Troubleshooting Guide E 4...
Page 249: ...Page 59 of 59 SK2015 SWC V EC 001...
Page 250: ...FSTD C V P ECM MOTOR...
Page 256: ...Page 7 of 73 SK2015 FSTDC V P ECM 001 A 2 Unit Appearance FSTDC VAR FSTDC HAR FSTD...