Page
29
of 77
SK2019 FCSD(H)-V/P-ECM-001
Fresh Air Renewal Connection
The fresh air system for cassette unit allows up to 15% of airflow (maximum air flow per connection is 100m
3
/h) to be fresh
air intake (per connection). Maximum 2 fresh air connections per unit are allowed.
1.
The corners of the cassette allow separate ductwork to be installed for outside air intake (Figure B.10.1)
2.
Cut and remove thermal insulating material.
3.
Open the mounting plate (Figure B.10.2 and Figure B.10.3)
4.
Install the flange to casing and attach with 2 screws. (Figure B.10.4 and B.10.5)
Figure B.10.1
Figure B.10.2
Figure B.10.3
Summary of Contents for FDLA-09
Page 1: ...SK2018 GLOBAL FDLA V P AC 001 FDLA V P AC MOTOR...
Page 27: ...Page 26 of 51 SK2018 GLOBAL FDLA V P AC 001 Configuration Settings...
Page 53: ...FDHD V P AC MOTOR...
Page 69: ...B 1 4 4 Electrical connections T Configuration standard version...
Page 74: ...Wiring Diagram D 2 SK NCPDWH 001b S Configuration Full Control PCB...
Page 76: ...Configuration Settings D 3...
Page 111: ......
Page 112: ...SK2019 FCSD H V P ECM 001 FCSD H V P ECM MOTOR...
Page 190: ...SK2019 FCSD H V P ECM 001...
Page 191: ...Page 1 of 59 SK2015 FMCD V EC 001 FMCD ECM MOTOR...
Page 210: ...Page 20 of 59 SK2015 SWC V EC 001 D 1 3 Wiring Diagram SK NCSWC 001...
Page 233: ...Page 43 of 59 SK2015 SWC V EC 001 D 4 2 Wiring diagram SK NCSWC 002...
Page 248: ...Page 58 of 59 SK2015 SWC V EC 001 Troubleshooting Guide E 4...
Page 249: ...Page 59 of 59 SK2015 SWC V EC 001...
Page 250: ...FSTD C V P ECM MOTOR...
Page 256: ...Page 7 of 73 SK2015 FSTDC V P ECM 001 A 2 Unit Appearance FSTDC VAR FSTDC HAR FSTD...