Page
41
of 77
SK2019 FCSD(H)-V/P-ECM-001
Condensate Pump Kit Replacement
Refer to Section C.5. for Steps 1, 2 and 3.
Step 4: Remove front panel and disconnect
stepping motor and IR receiver.
Step 5: Unscrewing the 8 screws as shown
above.
Step 6: Remove the drain pan and internal drain
pan.
Step 7: Remove the pump kit (including Drain
pump and Float switch) and replace it.
Control Box Replacement
Refer to Section C.5. for Steps 1, 2 and 3.
Step 4: Remove 2 screws from the control box and
slide it out.
Step 5: Remove the terminal cover by undoing the 4
screws. Disconnect wiring on the terminal. Replace
with a new control box and reconnect the wires.
Summary of Contents for FDLA-09
Page 1: ...SK2018 GLOBAL FDLA V P AC 001 FDLA V P AC MOTOR...
Page 27: ...Page 26 of 51 SK2018 GLOBAL FDLA V P AC 001 Configuration Settings...
Page 53: ...FDHD V P AC MOTOR...
Page 69: ...B 1 4 4 Electrical connections T Configuration standard version...
Page 74: ...Wiring Diagram D 2 SK NCPDWH 001b S Configuration Full Control PCB...
Page 76: ...Configuration Settings D 3...
Page 111: ......
Page 112: ...SK2019 FCSD H V P ECM 001 FCSD H V P ECM MOTOR...
Page 190: ...SK2019 FCSD H V P ECM 001...
Page 191: ...Page 1 of 59 SK2015 FMCD V EC 001 FMCD ECM MOTOR...
Page 210: ...Page 20 of 59 SK2015 SWC V EC 001 D 1 3 Wiring Diagram SK NCSWC 001...
Page 233: ...Page 43 of 59 SK2015 SWC V EC 001 D 4 2 Wiring diagram SK NCSWC 002...
Page 248: ...Page 58 of 59 SK2015 SWC V EC 001 Troubleshooting Guide E 4...
Page 249: ...Page 59 of 59 SK2015 SWC V EC 001...
Page 250: ...FSTD C V P ECM MOTOR...
Page 256: ...Page 7 of 73 SK2015 FSTDC V P ECM 001 A 2 Unit Appearance FSTDC VAR FSTDC HAR FSTD...