SiUS331604E
Test Operation
Field Setting
74
1.3
Test Operation
To start smoothly, a crankcase heater is equipped to the unit. To power up the crankcase heater in advance, be
sure to turn on the power supply 6 hours before operation.
Warning
Be sure to inform other installers or attach the front panel well before leaving with the power supply turned on for
the outdoor unit.
Before powering on
Protect the electronic components with insulating tape in accordance with the "Service Precautions" label
attached to the front panel.
All indoor units connected with the outdoor unit will operate automatically after powering on.
To ensure safety, ensure that the indoor unit installation has been completed.
1. Powering on ~ test operation
Make sure to perform a test run first after installation (If the unit is operated with the indoor unit remote
controller but without performing a test operation, the error code
U3
will be indicated on the display of the
remote controller and the unit will not operate normally).
After turning on the power supply, do not touch any switches excluding button switches and changeover
switches when setting the outdoor unit PCB (A2P).
(For positions of the button switches (BS1~5) and changeover switches (DS1-1, 2) on the PCB, refer to the
"Service Precautions" label)
Check the state of the outdoor units and fault wiring with this operation.
(1) • Attach the front panel of the outdoor unit.
• Turn on the power supply of the outdoor and indoor units.
Caution
To power up the crankcase heater in advance, be sure to turn on the power supply 6 hours before operation.
(2) • Remove the front panel of the outdoor unit.
• Check LED display of the outdoor unit PCB (A1P, A2P), to observe whether data transmission is normal.
Caution
Don't touch the switches other than button switches and changeover switches of the PCB (A2P) during setting.
Failure to do so may result in electric shock.
(3) • If customer wishes to perform LOW NOISE operation or DEMAND operation, perform setting with the push
buttons (BS1 ~ 5) on outdoor unit PCB (A2P).
• Operate the push buttons from the opening of the insulating cover. (See Protective range of the "Service
Precautions" label for details)
Outdoor unit PCB
A1P
A2P
LED display
(Factory setting)
SERVICE
MONITORING
LAMP
MODE
READY /
ABNORMAL
C/H CHANGEOVER
LOW NOISE
DEMAND
IND
MASTER
SUB
HAP
H1P
H2P
H3P
H4P
H5P
H6P
H7P
l
h
h
k
h
h
h
h
LED display
h
Light OFF
k
Light ON
l
Blinking
Summary of Contents for VRV IV-S RXTQ-TAVJU Series
Page 1: ...Service Manual SiUS331604E RXTQ36 48 60TAVJU Heat Pump 60 Hz...
Page 254: ...Wiring Diagrams SiUS331604E 241 Appendix RXTQ48TAVJU 3D100496A...
Page 255: ...SiUS331604E Wiring Diagrams Appendix 242 RXTQ60TAVJU 3D100497A...
Page 260: ...Wiring Diagrams SiUS331604E 247 Appendix FXEQ07 09 12 15 18 24PVJU C 3D098557...
Page 267: ...SiUS331604E Wiring Diagrams Appendix 254 FXTQ12 18 24 30 36 42 48 54PAVJU 3D065036G...
Page 270: ...Wiring Diagrams SiUS331604E 257 Appendix VAM1200GVJU 3D073270C...
Page 271: ...Revision History Month Year Version Revised contents 06 2016 SiUS331604E First edition...