![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-b-series/super-multi-nx-b-series_service-manual_2459105254.webp)
Si12-308
Outdoor Unit (52 / 58 / 68 / 75 Class)
Removal Procedure
243
2.2
Removal of
Electrical BOX
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the tie wires
Remove the piping in the
backward direction.
1
The figure shows the tie
pipe connections.
2
Remove the terminal
board fitting screw.
Match the colours of the tie
wires to A, B, C and D ports
as follows.
(1) - Black Power
(2) - White Power
(3) - Red Transmission
Wires are fixed to the
terminal board with screws.
Terminal board is made of
integral moulded resin.
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...