![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-b-series/super-multi-nx-b-series_service-manual_2459105233.webp)
Outdoor Unit (80 / 90 Class)
Si12-308
222
Removal Procedure
1.3
Removal of
Electrical Box
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the outer panels
such as top and front
panels.
Match the colors of the tie
wires to A, B, C and D ports
as follows.
(1) - Black
Power
(2) - White
Power
(3) - Red
Transmission
Wires are fixed to the
terminal board with screws.
1
The figure shows the
right side view.
1. Remove the tie wire.
1
Loosen the terminal
board screws, and
remove the wires at A
and B ports.
2
Open the terminal
board cover, and
remove the wires at C
and D ports.
When reassembling,
reconnect the wires to C and
D ports.
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...