![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-b-series/super-multi-nx-b-series_service-manual_2459105234.webp)
Si12-308
Outdoor Unit (80 / 90 Class)
Removal Procedure
223
3
Remove the earth wire.
4
Remove 1 screw of the
terminal board.
5
Release the tab on the
top right of the terminal
board.
6
Pull out the terminal
board and open it.
Glass tube fuse and varistor
cannot be replaced
individually because lead-
free soldering is provided.
Step
Procedure
Points
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...