![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-b-series/super-multi-nx-b-series_service-manual_2459105110.webp)
Si12-308
Control Specification
Function and Control
99
3.10
Defrost Control
Outline
Heat Pump Only
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than its fixed value when finishing.
Detail
Conditions for Starting Defrost
The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 47 minutes of accumulated time pass since the start of the
operation or ending the defrosting.
Conditions for Canceling Defrost
The judgment must be made with heat exchanger temperature. (4°C~12°C)
3.11
Low Hz High Pressure Limit
Outline
Heat Pump Only
Set the upper limit of high pressure in a low Hz zone. Set the upper limit of the indoor heat
exchanger temperature by its operating frequency of Hz. Separate into three zones, reset zone,
unchanged zone and drooping zone and the frequency control must be carried out in such
zones.
Detail
Separate into Zones
Note:
Drooping: The system stops 2 minutes after staying in the drooping zone.
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...