![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-b-series/super-multi-nx-b-series_service-manual_2459105240.webp)
Si12-308
Outdoor Unit (80 / 90 Class)
Removal Procedure
229
1.4
Removal of
PCB
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the controller
PCB
1
Release the tab of the
electrical box, and open
the terminal board.
2
Disconnect each
connector of the
terminal board.
3
Unscrew 1 screw and
release two tabs to
remove the PCB
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...