System Configuration
Si12-308
112
System Configuration
1. System Configuration
1.1
Operation Instructions
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Summary of Contents for Super Multi NX B series
Page 7: ...Si12 308 vi Table of Contents ...
Page 29: ...List of Functions Si12 308 18 List of Functions ...
Page 71: ...Specifications Si12 308 60 Specifications ...
Page 175: ...Instruction Si12 308 164 System Configuration ...
Page 227: ...Check Si12 308 216 Service Diagnosis ...
Page 288: ...Si12 308 Wiring Diagrams Appendix 277 FTXD50BVMC FTXD60 71BVMC ...
Page 299: ...Si12 308 iv Index ...