4
|
Components
Service manual
169
RXM20~71R(9) + ARXM25~71R(9) + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11B – 2022.02
e
Indoor unit main PCB
f
Switch box screw
g
Switch box
2
Route the connectors of the indoor unit fan motor, swing flap motor, damper
motor, streamer unit and thermistors (air + heat exchanger) inside the switch
box and connect them to the indoor unit main PCB.
3
Install and tighten the two screws to secure the switch box.
4
Attach the wiring harnesses to the switch box as needed.
5
Install the air and heat exchanger thermistor in their holders.
6
Connect the grounding wire to the back side of the switch box using the
screw.
7
Install the plate and fix it to the indoor unit heat exchanger using the screw.
8
Connect the power supply wiring to the power supply terminal X1M.
9
Install the power supply wiring bracket. Install and tighten the screw.
4.15 Reactor
4.15.1 Checking procedures
To perform an electrical check of the reactor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
2
Visually check the reactor for any damage or burnt‑out components. If any
damage is found, replace the reactor, see
Class 20~35 units
1
Check that the reactors are firmly installed on the main PCB.
a
a
a
Reactor