
Si04-306
Indoor Unit
Removal Procedure
141
1.3
Removal of the Horizontal
Blades
/ Vertical Blades
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the
horizontal
blade
s.
1
Open the horizontal
blades.
It has no fixing screws inside
blades, though previous
models had.
2
Undo the left pivot of
the horizontal blades.
3
Bend the horizontal
blades slightly and
release the center
pivots.
Slide the horizontal
blades to the left and
release the right pivot.
Installation procedure
1. Since key pattern hook is
provided, rotate the blades
and fit it to the right pivot
first.
2. Fit the blades to the center
and left pivots.
Summary of Contents for FTKD50BVM
Page 17: ...List of Functions Si04 306 8 List of Functions ...
Page 35: ...Specifications Si04 306 26 Specifications ...
Page 143: ...Check Si04 306 134 Service Diagnosis ...
Page 187: ...Outdoor Unit Si04 306 178 Removal Procedure ...
Page 191: ...Others Si04 306 182 Others ...
Page 201: ...Wiring Diagrams Si04 306 192 Appendix FTKD 18 24 28 BVMS ...
Page 203: ...Wiring Diagrams Si04 306 194 Appendix RKD 18 24 28 BVMS ...