![background image](http://html.mh-extra.com/html/daikin/2mks40dvmb/2mks40dvmb_service-manual_501073092.webp)
SiBE12-
519
Instruction
System Configuration
83
FLK(X)S25/35
Names of parts
■
Indoor Unit
The indoor unit can be installed either to the ceiling or to a wall. The descriptions contained in this man-
ual show the case when installation is being carried out to the ceiling. (The methods of operation used
are the same when installing to a wall.)
■
Opening the front grille
How to open the front grille
CAUTION
• Before opening the front grille, be sure to stop the operation and turn the breaker OFF.
O N
OFF
1
2
3
4
5
6
11
12
10
7
9
8
13
14
Summary of Contents for 2MKS40DVMB
Page 10: ...SiBE12 519 List of Functions 1 Part 1 List of Functions 1 Cooling Only 2 2 Heat Pump 4 ...
Page 15: ...Heat Pump SiBE12 519 6 List of Functions ...
Page 29: ...Heat Pump SiBE12 519 20 Specifications ...
Page 135: ...Instruction SiBE12 519 126 System Configuration ...
Page 211: ...Outdoor Unit SiBE12 519 202 Removal Procedure ...