6
Run preparations
About this chapter
This chapter provides the information required to prepare ÄKTA flux s for operation.
Before ÄKTA flux s is taken into operation, make sure that all procedures in the
following chapter and section have been performed:
•
Chapter 5 Installation, on page 61
•
Section 9.1 User maintenance schedule, on page 166
In this chapter
Section
See page
Install Kvick Lab packet and holder
Precautions
WARNING
Before performing any of the procedures described in this chapter,
you must read and understand all contents of the corresponding
sections in
Chapter 2 Safety instructions, on page 13
, as listed
below:
•
General precautions, on page 15
•
Personal protection, on page 15
•
6 Run preparations
98
ÄKTA flux s Operating Instructions 29046893 AG