Final checks before start
NOTICE
Make sure that the actions listed below are completed before
ÄKTA flux s is started.
•
Check that there is process liquid in the tank.
•
Check that all inlets and outlets to the system are connected, closed or in appro-
priate state depending on the designed process. Inlets and outlets that are not in
use shall be closed.
•
Check the condition of all connections and gaskets. Tighten connections and
replace gaskets if needed.
•
Check that only chemicals specified for the system are used.
7 Operation
7.1 Start the system
ÄKTA flux s Operating Instructions 29046893 AG
131