Component
Action
Complete system
A preventive maintenance test procedure on all systems,
sensors, pumps and valves should be performed annually by
trained and certified personnel. Contact your local Cytiva
representative. Replace all gaskets, O-rings, and valve or pres-
sure sensor diaphragms.
Pump of peri-
staltic type
Replace all wear and tear parts.
9 Maintenance
9.1 User maintenance schedule
ÄKTA flux s Operating Instructions 29046893 AG
167