PISTON AND CYLINDER
PC-7
ASSEMBLY
Mount the following parts as per specified order:
-
a new cylinder base gasket,
-
the cylinder,
-
a new O-ring to the cylinder,
-
and new O- rings for the stud bolts.
-
a new O ring to the clean cylinder head
-
and install the cylinder head.
Tighten the cylinder head nuts crosswise.
Tightening torque: 14 - 16 Nm
Attach cables, hoses, spark plug etc.
Cooling water
connection
Spark plug
Cylinder head
nuts
Summary of Contents for SuperCross Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 14: ...GENERAL INFORMATION GI 10 NOTES...
Page 15: ...TECHNICAL DATA SPECIFICATIONS TD 2 TIGHTENING TORQUES TD 4...
Page 16: ...TECHNICAL DATA TD 2 SYSTEM OVERVIEW...
Page 20: ...TECHNICAL DATA TD 6 NOTES...
Page 21: ...SPECIAL TOOLS ST 1 SPECIAL TOOLS DESCRIPTION AND USAGE ST 2...
Page 24: ...SPECIAL TOOLS ST 4 NOTES...
Page 26: ...CARBURETOR FL 2 SYSTEM OVERVIEW Dell Orto...
Page 27: ...CARBURETOR FL 3 Mikuni...
Page 35: ...CARBURETOR FL 11 NOTES...
Page 36: ......
Page 38: ...2 STROKE OIL PUMP LB 2 SYSTEM OVERVIEW...
Page 41: ...2 STROKE OIL PUMP LB 5 NOTES...
Page 42: ......
Page 44: ...PISTON AND CYLINDER PC 2 SYSTEM OVERVIEW...
Page 50: ...PISTON AND CYLINDER PC 8 NOTES...
Page 51: ...CLUTCH GEARBOX CG 1 CLUTCH GEARBOX SYSTEM OVERVIEW CG 2 DISMANTLING CG 3 ASSEMBLY CG 12...
Page 52: ...CLUTCH GEARBOX CG 2 SYSTEM OVERVIEW...
Page 67: ...CLUTCH GEARBOX CG 17 NOTES...
Page 68: ......
Page 72: ...FRAME CHASSIS FC 4 NOTES...
Page 84: ...ELECTRICAL SYSTEM ES 12 ELECTRICAL SYSTEM ES 12 WIRING DIAGRAM...
Page 85: ...ELECTRICAL SYSTEM ES 13 NOTES...