![CONTROL SOLUTIONS ValuPoint 4 User Manual Download Page 36](http://html1.mh-extra.com/html/control-solutions/valupoint-4/valupoint-4_user-manual_2658648036.webp)
7.0 Skip This for First Time Startup
When connecting and syncing for the first time, you should go to the ‘Object Map List’
page and read all object maps with one click of the mouse. The I/O assignment page
will be filled in automatically when configuration is read from a device or loaded from a
file.
If you do not wish to start with the default (or existing) hardware assignments, then
you should first allocate object counts, then come to this page to assign I/O before
moving on.
7.1 Assigning Physical I/O Points to BACnet Objects
7. I/O Point Assignments
file:///C:/AAA_CSI/Literature/2016 User Guides/VP4-BACnet User Gui...
1 of 5
11/3/2016 10:41 AM