![CommScope e-POI Installation Manual Download Page 68](http://html1.mh-extra.com/html/commscope/e-poi/e-poi_installation-manual_2643780068.webp)
ERA® WCS and e-POI Subracks and Power Supply Unit Installation Guide
M0201ABK_uc
Page 68
© June 2021 CommScope, Inc.
Install and Connect the Subrack Cards
Cabling OPT Cards to Connect a TEN to a Switching CAN
In this process you will connect SFP+ Modules to the fiber cable and then use the cable to connect a TEN to a
Switching CAN.
1
"SFP+ Modules Tested for use with ERA” on page 62
.
2
Obtain a pair of SFP+ Modules that correspond to the length and type of fiber you will use to connect the
CAN to the TEN or the WIN. Note the maximum range listed in
3
Follow local practice or manufacturer recommendations to clean fiber connectors.
4
Connect one end of the cable with an SFP+ Module into one of the OPT Card ports (labeled
1
-
4
) installed
in the Switching CAN—you can only use Slots
L1
-
L8
in the Switching CAN.
5
Connect the other end of the cable with an SFP+ Module into an OPT Card in the TEN, as follows:
•
Use Port R1.1 to connect to the Switching CAN.
•
Use Ports R1.2 through R1.4 for additional TEN-to-CAN links.
The graphics used in this process show a WCS-4 Subrack as a Switching CAN, and a WCS-2 Subrack as a
TEN. The same rules for slots and port connections apply if the Switching CAN was a WCS-2 Subrack or the
TEN was a WCS-4 Subrack.
WCS-4 Subrack configured as a Switching CAN
WCS-2 Subrack configured as a TEN