![CommScope e-POI Installation Manual Download Page 76](http://html1.mh-extra.com/html/commscope/e-poi/e-poi_installation-manual_2643780076.webp)
ERA® WCS and e-POI Subracks and Power Supply Unit Installation Guide
M0201ABK_uc
Page 76
© June 2021 CommScope, Inc.
Install and Connect the Subrack Cards
Figure 14.
CDD Card in a Classic CAN Connecting to a BBU
WCS-4 configured as a Classic CAN
Single-Mode Fiber (SMF) cable
with dual-fiber LC jumpers
AirScale FSM4 with ABIA Modules
to a CDD CPRI Port (1, 2, 3, 4, 5, or 6)
to an ABIA Module CPRI connector (RF-1, RF-2, RF-3, RF-4, RF-5 or RF-6)