![CommScope e-POI Installation Manual Download Page 66](http://html1.mh-extra.com/html/commscope/e-poi/e-poi_installation-manual_2643780066.webp)
ERA® WCS and e-POI Subracks and Power Supply Unit Installation Guide
M0201ABK_uc
Page 66
© June 2021 CommScope, Inc.
Install and Connect the Subrack Cards
Cabling OPT Cards to Connect the TEN to a Classic CAN
In this process you will connect SFP+ Modules to the fiber cable and then use the cable to connect the TEN to
a Classic CAN.
1
"SFP+ Modules Tested for use with ERA” on page 62
.
2
Obtain a pair of SFP+ Modules that correspond to the length and type of fiber you will use to connect the
CAN to the TEN. Note the maximum range listed in
3
Follow local practice or manufacturer recommendations to clean fiber connectors.
4
Connect one end of the cable with an SFP+ Module into one of the OPT Card ports (labeled
1
-
4
) installed
in the CAN.
5
Connect the other end of the cable with an SFP+ Module into
Port
1
on the OPT Card installed in
Slot R1
of the TEN.
The graphics used in this process show a WCS-4 Subrack as a Classic CAN, and a WCS-2 Subrack as a TEN.
The same rules for slots and port connections apply if the Classic CAN was a WCS-2 Subrack or the TEN
was a WCS-4 Subrack.
WCS-4 Subrack configured as a Classic CAN
WCS-2 Subrack configured as a TEN