![CommScope e-POI Installation Manual Download Page 64](http://html1.mh-extra.com/html/commscope/e-poi/e-poi_installation-manual_2643780064.webp)
ERA® WCS and e-POI Subracks and Power Supply Unit Installation Guide
M0201ABK_uc
Page 64
© June 2021 CommScope, Inc.
Install and Connect the Subrack Cards
Cabling OPT Cards to Connect a WIN a Switching CAN
In this process you will connect SFP+ Modules to the fiber cable and then use the cable to connect a WIN to a
Switching CAN.
1
"SFP+ Modules Tested for use with ERA” on page 62
.
2
Obtain a pair of SFP+ Modules that correspond to the length and type of fiber you will use to connect the
CAN to the WIN. Note the maximum range listed in
.
3
Follow local practice or manufacturer recommendations to clean fiber connectors.
4
Connect one end of the cable with an SFP+ Module into one of the OPT Card ports (labeled
1
-
4
) installed
in the Switching CAN—you can only use Slots
R1
-
R8
in the Switching CAN.
5
Connect the other end of the cable with an SFP+ Module into
Port
1
on the OPT Card installed in
Slot L1
(
L1.1
) of the WIN.
The graphics used in this process show a WCS-4 Subrack as a Switching CAN, and a WCS-2 Subrack as a
WIN. The same rules for slots and port connections apply if the Switching CAN was a WCS-2 Subrack or
the WIN was a WCS-4 Subrack.
WCS-4 Subrack configured as a Switching CAN
WCS-2 Subrack configured as a WIN