Sea Tel 9711-56 IMA
Installation in 168” Radome
5-19
EAR Controlled - ECCN EAR99
29.
Rotate the flexible
waveguide and harness up
over the top strut/Ku-Band
feed.
30.
Attach flexible waveguide
section to the rigid
waveguide section using the
8 screws, flat washer
through the adjoined
flanges.
31.
Install flat washer, lock
washer and hex nut on each
srcew and tighten all 8 hex
nuts to torque spec.
32.
Install cable ties on the feed
harness to following the
cable path around the back
of the reflector to the ICU &
QOR Switch.
33.
Route the C-Band feed
harness along the rigid
waveguide, around the
back/top of the reflector to
the right side where the ICU
and QOR Switch Box are
located.
34.
Connect the C-Band feed
harness to QOR switch box
J4 connector and tighten
the retainer screws.
35.
Connect the C-Band LNB
coax to S1A on the top of
the QOR switch box.
36.
Remove the 4 nylock nuts
from the bolts that pass up
through the wood and lower
isolation plate.
37.
Discard this hardware.
Summary of Contents for Sea Tel 9711-56 IMA C Band
Page 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 174: ......
Page 175: ......
Page 176: ......
Page 213: ......
Page 214: ......
Page 225: ......
Page 226: ......
Page 233: ......
Page 234: ......