Installation in 168” Radome
Sea Tel 9711-56 IMA
5-22
EAR Controlled - ECCN EAR99
50.
Align the 4 mounting holes
in the lower isolation plate
to the holes in the top of the
AZ Post.
51.
Lower the pedestal &
reflector assembly to be on
the top of the AZ Post,
52.
Apply Loctite to and install
the 4 mounting bolts up
through the top of the AZ
Post & lower isolation plate.
53.
Install 4 flat washers & hex
nuts on the bolts and tighten
to torque spec.
54.
Locate the louvered panel
which has the breaker box
mounted in it (this is the AFT
panel).
55.
Set it in place at the AFT
section of the AZ Post.
56.
Connect power to breaker
by mating the power plugs.
57.
Attach the Ground wire to
the burnished threaded hole
is the AZ Post leg.
58.
Mount the panel using
hardware provided (leave all
screws lose at this time).
59.
Connect TXIF and RXIF coax
cables to the coax
interconnect bracket inside
the legs of the AZ post.
60.
Install the 3 other louvered
panels using hardware
provided.
61.
Tighten all panel mounting
hardware.
62.
Install ratchet straps
(provided in the antenna
stow kit) by hooking into the
elevation beams and the
spider.
63.
Tighten straps to restrain
movement of the antenna.
The pedestal & reflector assembly is now installed on the base frame assembly.
Summary of Contents for Sea Tel 9711-56 IMA C Band
Page 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 174: ......
Page 175: ......
Page 176: ......
Page 213: ......
Page 214: ......
Page 225: ......
Page 226: ......
Page 233: ......
Page 234: ......