Installation in 144” Radome
Sea Tel 9711-56 IMA
4-4
EAR Controlled - ECCN EAR99
4.4.1.
Base Frame
To open and prepare the Base Frame use the following procedure.
1.
Remove the screws around 3
sides of the perimeter of the
base of the crate.
Leave this side (with the
Opening) in place
2.
Lift the top of the crate off of
the pallet.
3.
Move the top of the crate
away from the work area.
4.
You can assemble the ADE
with the base frame bolted to
the pallet, or remove it from
the pallet.
Summary of Contents for Sea Tel 9711-56 IMA C Band
Page 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 174: ......
Page 175: ......
Page 176: ......
Page 213: ......
Page 214: ......
Page 225: ......
Page 226: ......
Page 233: ......
Page 234: ......