Sea Tel 9711-56 IMA
Installation in 168” Radome
5-13
EAR Controlled - ECCN EAR99
47.
The upper section of the
radome is now complete.
48.
Place short pieces of 2”x4”
boards under the perimeter of
the radome top to raise it up off
of the ground.
49.
Attach 4 radome lifting brackets
(PN 131514-2), or other lifting
arrangement, to four opposite
vertical flange mounting points
(every other vertical flange).
Orient the brackets with the
shackle outside the perimeter of
the bottom radome flange.
Hold the bracket under the
bottom flange and install a bolt
and fender washer down
through the hole on one side of
the vertical seam, through the
slot on that side of the bracket
and tighten a nut on the
underside of the bracket
50.
Install a second bolt and fender
washer down through the hole
on the other side of the vertical
seam, through the slot on that
side of the bracket and tighten a
nut on the underside of the
bracket
51.
Repeat steps 16 & 17 to install
the other 3 brackets under
opposing flanges (every other
vertical seam).
52.
Attach web strap lifting sling to
the four shackles.
53.
The upper panel assembly is
now ready to lift onto the lower
section.
[It will be installed
AFTER the pedestal and
antenna assemblies have been
installed inside the lower
section of the radome]
The bottom half of the radome is
complete. Next you will assemble your
antenna pedestal General Assembly
and install it into this portion of the
radome, before putting the top half of
the radome on.
Summary of Contents for Sea Tel 9711-56 IMA C Band
Page 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Page 174: ......
Page 175: ......
Page 176: ......
Page 213: ......
Page 214: ......
Page 225: ......
Page 226: ......
Page 233: ......
Page 234: ......