O P E R A T I N G M A N U A L
8 0 0 . 7 4 9 . 2 7 6 1
w w w . c o a c h c o m m . c o m
1 0 8
4. Access each CU’s menu (Wired Settings > Intercom Settings) and verify that all 2-Wire ports are set to AudioCom
(“A-C”).
5. If desired, connect your backup wired BeltPacks for all users
to the Wired Interface Panel.
A. Power on wired BeltPacks and make sure TALK buttons
are off.
6. Perform the dry pair test and auto-null all of the lines from the
press box using X-Ware’s Conference view (under the System
Settings menu).
IMPORTANT
:
Do not auto-null the sideline CUs and press box
CUs at the same time.
7. Test operation of the press box RPs.
8. After the game, power off and stow away X-System wireless
press box components.
Dry Pair Workflow
Reminders:
• The Press Box CUs will be turned on
and will configure the Press Box RTs.
• The RPs’ active pairing should be to the
primary (top) press box CU.
• X-Ware will control the press box CUs,
and it will operate separately from the
sideline system’s X-Ware.
!