750-177
3-1
CHAPTER 3
Pressure Vessel Care
B. Water Requirements (Hot Water Boilers) 3-1
C. Water Requirements (Steam Boilers) 3-4
J. Preparation For Extended Layup 3-11
A. GENERAL
This chapter is devoted primarily to the waterside care of the pressure vessel.
Proper water supply and treatment are essential to boiler life and length of service. Proper water treatment
will pay dividends in the form of longer life, less downtime, and prevention of costly repairs.
Hot water boilers require proper circulation. The
system must be operated as intended by its
designer in order to avoid the possibility of thermal
shock with severe stress to the pressure vessel.
Figure 3-1: Upper Drum (Hot Water)
A
B
C
C
A. HOT WATER OUTLET
B. AIR VENT TAPPING
C. PRESSURE/TEMPERATURE GAUGES
Although it is of prime importance, the subject of
water supply and treatment cannot adequately be
covered in this manual. For specific information or
a s s i s t a n c e w i t h y o u r w a t e r t r e a t m e n t
requirements, contact your local Cleaver- Brooks
authorized representative.
B. WATER REQUIREMENTS (HOT
WATER BOILERS)
Air Removal
The hot water outlet (Figure 3-1) is located in the
top drum of the boiler. This location reduces the
possibility of released air (which is trapped at the
top of the drum) from entering the system. Any air
(or oxygen) that may be released in the boiler will
collect at the top of the upper drum, where it will
escape through the air vent tapping. The tapping
must be properly piped to the expansion tank or a
stand pipe and air bleeder to remove gases that
collect at the top of the drum.
Summary of Contents for FLX 1000
Page 12: ...Chapter 1 General Description 1 6 750 177...
Page 68: ...Chapter 2 Profire V Burner 2 56 750 177...
Page 90: ...Chapter 4 Sequence of Operation 4 10 750 177...
Page 104: ...Chapter 5 Adjustment Procedures 5 14 750 177...
Page 110: ...Chapter 6 Troubleshooting 6 6 750 177...
Page 122: ...8 2 750 177 Figure 8 1 Typical Hot Water Flextube Casing...
Page 124: ...8 4 750 177 Figure 8 2 Typical Low Pressure Steam Flextube Casing...
Page 126: ...8 6 750 177 Figure 8 3 Typical High Pressure Steam Flextube Casing...
Page 128: ...Parts Chapter 8 8 8 750 177 Steam Pressure Controls...
Page 129: ...Chapter 8 Parts 750 177 8 9 Water Level Controls...
Page 130: ...Parts Chapter 8 8 10 750 177 Water Level Controls continued...
Page 131: ...Chapter 8 Parts 750 177 8 11 Water Column Main and Aux 15 Steam...
Page 132: ...Parts Chapter 8 8 12 750 177 Water Column Main and Aux 150 Steam...
Page 133: ...Chapter 8 Parts 750 177 8 13 Safety Valves...
Page 134: ...Parts Chapter 8 8 14 750 177...
Page 135: ......
Page 136: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...