750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
3-15
3.10 — Preparation for Extended Lay-Up
water and steam valves should be closed. Damper and vents should be closed to prevent air from reaching fireside
surfaces. Periodic inspection should be made and absorption materials renewed.
Wet storage is generally used for a boiler held in stand-by condition or in cases where dry storage is not practical.
The possibility of freezing temperatures must be considered. Care must again be taken to protect metal surfaces.
Variables preclude definite recommendations. However, it is suggested that the pressure vessel be drained, thor-
oughly cleaned internally, and re-filled to overflowing with treated water. If deaerated water is not available, the unit
should be fired to boil the water for a short period of time. Additional chemicals may be suggested by your local
Cleaver-Brooks authorized representative to minimize corrosion. Internal water pressure should be maintained at
greater than atmospheric pressure. Nitrogen is often used to pressurize the vessel. Fireside surfaces must be thor-
oughly cleaned and the refractory should be wash-coated.
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...