![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 40](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062040.webp)
Burner Operation and Control
2-14
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
2.7 — Controls for Combination Burners Only
Burners equipped to burn either oil or gas include equipment for each fuel. The Gas-Oil Selector Switch engages
the appropriate interlocks and controls for gas or oil operation. Chapter 4 details the required mechanical functions
of each fuel system.
Manual Bypass Valve
Provided as a timer saver in establishing oil flow. When open, it per-
mits circulation of oil through the supply and return lines. The valve
MUST
be closed prior to initial light off.
Orifice Oil Control Valve
Valve may be opened prior to startup to aid in establishing fuel oil
flow through the controller. The valve
MUST
be closed prior to
initial light off. Its disc has an orifice to permit a continuous circula-
tion of hot fuel oil through the controller.
Air Purge Valve
Solenoid valve opens simultaneously with closing of oil solenoid
valve at burner shutdown, allowing compressed air to purge oil
from the burner nozzle and adjacent piping. The oil is burned by
the diminishing flame, which continues burning for approximately 4
seconds after the oil solenoid valve closes.
Air Purge Orifice Nozzle
Limits purging air to proper quantity for expelling unburned oil at
normal delivery rate.
Air Purge Orifice Nozzle Filter
Filters the purging air of any particles that might plug the air purge
orifice nozzle.
Air Purge Check Valve
Valve check prevents fuel oil from entering the atomizing air line.
Air Purge Relay
When energized, control operation of air purge valve.
Component
Description
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...