Inspection and Maintenance
8-36
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
The condensate from steam oil heaters must be safely discharged to waste. The waste should be checked periodi-
cally for any traces of oil that would indicate leaking tubes within the heater.
The hot water oil heater contains a heat transfer solution. Oil flows through an inner tube while boiler water sur-
rounds the outer tube. The space between the two tubes is filled with the heat transfer solution and is connected to
an expansion chamber on the rear of the heater. A visual indicator on the chamber reveals the presence of any oil if
an oil leak occurs.
A 50/50 solution of permanent antifreeze and water is generally used as the heat transfer solution. If there is no
danger of freezing, plain water may be used as a replenishment if necessary to refill.
Evidence of oil in either the steam heater condensate or in the water heater indicator demands prompt repairs.
8.24 — Combustion
The frequency of burner adjustments depends upon several factors, including type of burner, type of fuel, load
conditions, ambient temperature, climatic variables, and general maintenance practices.
The air-fuel ratio should be checked monthly in order to alert the operator to losses in efficiency, which do not pro-
duce visible flame change. Any time maintenance is performed on the burner linkage, the air-fuel ratio should be
checked. Readjustment of the burner may be required due to variations in fuel composition. A combustion analyzer
should be used to adjust air-fuel ratio for maximum operating efficiency. If your burner requires adjustments, con-
tact your local Cleaver-Brooks authorized representative for assistance.
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...