![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 137](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062137.webp)
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
8-17
8.16 — Fan/Motor Cassette Installation
FIGURE 8-6.
Induced Flue Gas Recirculation System (IFGR)
8.16 — Fan/Motor Cassette Installation
To close the fan/motor cassette:
1.
Check that all adjustment screws are tight, and check the linkage and IFGR damper for free movement before
closing the unit.
2.
Position the cassette into the front door.
3.
Slide the cassette into position until it begins to contact the inlet gasket, then measure the clearance between the
cassette flange and the front door mounting face. There must be clearance of at least 1/4” to provide adequate
gasket compression when the cassette is mounted tightly to the door.
4.
Secure the cassette with the fastening nuts.
5.
After the cassette has been secured to the front head, reconnect the davit to the front door by screwing in the
retaining bolt at the top centerline.
Do not remove the davit arm assembly from the motor/fan cassette without first verifying that the cassette is securely
bolted to the boiler. Failure to follow these instructions could result in serious injury or death.
!
Warning
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...