750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
6-13
6.16 — Gas Pressure and Flow Information
The pressure required at the entrance to the burner gas train for rated boiler output is termed “net regulated pres-
sure.” The gas pressure regulator must be adjusted to achieve the pressure to assure full input.
FIGURE 6-6.
Minimum Net Regulated Gas Pressure for Rated Boiler Output
The pressure requirement varies with boiler size, altitude, and type of gas train. The pressures listed are based on
1000 Btu/cu. ft. natural gas at elevations up to 700 feet above sea level. For installation at higher altitudes, multiply
the selected pressure by the proper factor from Figure 6-7.
FIGURE 6-7.
Pressure/Altitude Correction Factors
Pressure Required at Gas Train Entrance with Two Valves and 3” Pipe
Boiler HP
Standard
HTB
LE
250
17.5” WC
22.0” WC
23.0” WC
300
23.0” WC
31.0” WC
32.5” WC
350
32.5” WC
42.5” WC
45.0” WC
Altitude
Feet Above Sea Level
Correction Factor
1000
1.04
2000
1.07
2500
1.09
3000
1.11
4000
1.16
5000
1.21
6000
1.25
7000
1.30
8000
1.35
9000
1.40
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...