750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
8-15
8.14 — Inspection and Adjustment
FIGURE 8-4.
Fan/Motor Cassette Removal
8.14 — Inspection and Adjustment
NOx levels should be checked periodically to ensure compliance with all local and federal regulations, as well as to
ensure that the boiler is operating at maximum efficiency. Linkages should be inspected and free movement (no
binding) of the IFGR damper confirmed.
Increasing or decreasing NOx levels could indicate incorrect damper positioning, loose linkages, an improper air-
to-fuel ratio, or stack draft changes. If adjustment is required, or if problems persist, contact your local Cleaver-
Brooks authorized representative for further assistance.
As ash and products of combustion pass through the IFGR damper, there will be some accumulation on the
damper, windbox, and other parts of the IFGR system and burner.
To ensure proper operation of the IFGR system and burner, inspection and cleaning should be performed at regu-
lar intervals, depending on the load, type of fuel, and combustion temperatures.
1.
With the IFGR damper exposed, inspect the internal linkages for secure connections, and check for free move-
ment of the linkage arms and the IFGR damper assembly. Check for free movement of the linkage by separating
the external linkage from the jackshaft drive arm(s) and cycling the exterior linkage through its range of move-
ment.
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...