Basics of Firetube Operation
1-6
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
1.4.3 — Modulating Pressure Control
Senses changing boiler pressures and transmits the information to the modulating motor to change the burner fir-
ing rate when the manual-automatic switch is set on “automatic.”
FIGURE 1-3.
Boiler Controls
1.4.4 — Low Water Cutoff and Pump Control
Float-operated control responds to the water level in the boiler. It performs two distinct functions:
•
Stops firing of the burner if water level lowers below the safe operating point. Energizes the low-water light in
the control panel, and it also causes the low-water alarm bell (optional equipment) to ring. Code requirements of
some models require a manual reset type of low-water cutoff.
•
Starts and stops the feedwater pump (if used) to maintain water at the proper operating level.
The CB Level Master is the standard low water cutoff on high pressure steam boilers. See CB manual 750-281 for
complete operation, maintenance, and parts information.
1.4.5 — Water Column Assembly
Houses the low-water cutoff and pump control and includes the water gauge glass and gauge glass shutoff cock.
Determine that the main and auxiliary low water cutoffs and pump control are level after installation and throughout
the equipment’s operating life. Failure to follow these instructions could result in equipment damage.
!
Caution
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...