![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 25](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062025.webp)
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
1-11
1.6 — IFGR Components
1.6.3 — Over-Travel Mechanism
The over-travel mechanism has two functions. It allows the linkage to pass through the front door, and it allows
jackshaft rotation to exceed (over-travel) IFGR linkage movement. A set of springs allows the linkage to stay in a
fixed position while the jackshaft rotates.
1.6.4 — Fuel Change-Over Linkage
When a boiler is equipped to fire either gas or oil (dual fuel boilers), and the required NO
X
levels are below 60 ppm
on natural gas, a dual linkage arrangement is used to provide the different recirculation rates required for each fuel.
Two jackshaft drive arms are provided, one for oil and one for gas. The linkage is manually connected to the appro-
priate arm, based on the fuel being used.
On dual fuel boilers with two jackshaft drive arms, as defined above, a proximity switch is used to prove that the
correct linkage connection is made. (Refer to the wiring diagram provided with the boiler.)
FIGURE 1-8.
Damper Linkage
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...