![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 150](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062150.webp)
Inspection and Maintenance
8-30
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
When opening the heads, either for routine maintenance or for an annual inspection, do not do so when the boiler
or the door is hot. The refractory will hold its temperature for some time and exposure to ambient temperature or
rapid cooling may cause refractory cracking and/or harm to the boiler and head metal.
When opening the front head of a CB-LE, either remove the motor and fan cassette assembly and swing the
assembly away from the head. Or, with the motor and cassette in place, remove the motor-to-davit-arm connecting
bolt to allow swinging the motor and fan cassette with the head.
After confirming that the electrical power and fuel are locked in the
off
position, disconnect the fuel lines.
Disconnect the main gas line coupling, the pilot line and the sight port air line. If the boiler is oil fired, remove the
supply and return oil lines and the oil pilot line if necessary. Remove the head bolts and swing the head.
The opened head should be supported by blocking or jacking to eliminate possible deformation of the head or hinge
area.
8.21.1 — Front Head
Inspect the second to third pass baffle gasket. If it is brittle, cracked or broken, replace the gasket.
Inspect the second to third pass baffle for a good seal at the tube sheet and the vessel.
If necessary, scrape old cement away and clean out and wire brush the sealing area to assure an effective bond
between the high temperature cement and the steel. Be sure not to obstruct the tubes with excess cement.
Scrape the old gasket material off the vessel to front head sealing area and the dry oven to front head sealing area.
Using a wire brush clean off any excess gasket material or rust. Using Spray Tack spray the area to hold the gasket
in place prior to closing the front head. Use new fasteners when replacing the tadpole gasket.
Inspect the condition of the blanket insulation on the front head. Replace the insulation if loose or torn.
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...