![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 76](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062076.webp)
Starting and Operating Instructions
5-4
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
On initial starting attempts, several efforts might be required to fully bleed the pilot line. While checking pilot
adjustment, observe whether the pilot flame is extinguished promptly when the burner switch is opened. A linger-
ing flame indicates a leaking gas pilot valve, which is a condition requiring correction before proceeding.
5.4 — Atomizing Air
The supply and pressure of the atomizing air on an oil-fired burner should be checked. Before starting, inspect the
oil pump lube oil level. Add oil if necessary to bring the level to the midpoint or slightly higher in the sight glass.
Use SAE 20 detergent oil of a grade mentioned in Chapter 8 and fill in accordance with instructions given there.
FIGURE 5-1.
Atomizing Air Compressor
Check the oil level of the air intake strainer. When operating a standard 78” boiler, make certain that the V-velt
which drives the air pump is in place and has proper tension.
To verify air flow and pressure, place the burner run/test switch on the program relay to the “test” position. If the
burner is a combination fuel burner, be sure that the gas/oil selector switch is set to “oil.” Turn the burner switch
on. The burner will cycle to the low fire pre-purge position and stop there.
FIGURE 5-2.
Atomizing Air Pressure Gauge
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...