![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 92](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062092.webp)
Adjustment Procedures
6-4
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
6.3 — Modulating Motor
The modulating motor has a 90º shaft rotation. The motor manufacturer also provides a 160º stroke model for
other applications. If a replacement is obtained from someone other than a Cleaver-Brooks Service or Parts repre-
sentative, it may have an incorrect stroke. To prevent damage, determine the 90º stroke prior to installing a replace-
ment.
The stroke may be determined by powering the motor and connecting terminals R-B to actually determine the
stroke as the motor drives to an open position.
FIGURE 6-3.
Modulating Motor
6.4 — Modulating Motor Switches: Low-Fire and High-Fire
The modulating motor contains either one or two internal switches, depending upon application. The micro-
switches are actuated by adjustable cams attached to the motor shaft.
Factory replacement motors have the cams preset. The low-fire start switch is set to make the red and yellow leads
at approximately 8º on motor closing. The high-fire purge air proving switch (located in the modulating motor) is
set to make red and blue tracer leads at approximately 60º on motor opening. Normally, the settings are left as is,
but job conditions may require readjustment. If the cams require adjustment or resetting, follow the instructions in
the manufacturer’s technical manual.
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...