![CleaverBrooks CBLE Operation And Maintenance Manual Download Page 157](http://html1.mh-extra.com/html/cleaverbrooks/cble/cble_operation-and-maintenance-manual_2622062157.webp)
750-91 (revised 2009)
Model CB-LE Packaged Boiler Manual
8-37
8.25 — Recommended Boiler Inspection Schedule
8.25 — Recommended Boiler Inspection Schedule
Daily
Monthly
Semi-Annually
Annually
•
Check water level
•
Check combustion
visually
•
Blow down boiler
•
Blow down water col-
umn
•
Record feedwater pres-
sure/temperature
•
Record flue gas tem-
perature
•
Record oil pressure and
temperature
•
Record gas pressure
•
Treat water according
to the established pro-
gram
•
Record atomizing air
pressure
•
Inspect burner
•
Inspect for flue gas leak
•
Inspect for hot spots
•
Check cams
•
Check for tight closing
of fuel valve
•
Check fuel and air link-
age
•
Check indicating lights
and alarms
•
Check operating and
limit controls
•
Check safety and inter-
lock controls
•
Check for leaks, noise,
vibration, unusual con-
ditions, etc.
•
Check low water cut-
off operation
•
Clean low water cutoff
•
Clean oil pump
strainer, filter
•
Clean air cleaner and
air/oil separator
•
Inspect refractory
•
Remove and clean oil
preheater
•
Check air pump cou-
pling alignment
•
Inspect/repair burner
housing to refractory
seal
•
Clean fireside surfaces
•
Clean breeching
•
Inspect waterside sur-
faces
•
Check operation of
safety valves
Summary of Contents for CBLE
Page 14: ...xiv 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 48: ...Burner Operation and Control 2 22 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 64: ...Waterside Care and Requirements 3 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 72: ...Sequence of Operation 4 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 158: ...Inspection and Maintenance 8 38 750 91 revised 2009 Model CB LE Packaged Boiler Manual...
Page 166: ...Parts 9 8 750 91 revised 2009 Model CB LE Packaged Boiler Manual Control Panel...
Page 168: ...Parts 9 10 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 7 Front Head Electrical...
Page 170: ...Parts 9 12 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 9 Front Head Insulation...
Page 174: ...Parts 9 16 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 12 Light Oil Air Piping...
Page 176: ...Parts 9 18 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 13 Heavy Oil Air Piping...
Page 182: ...Parts 9 24 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 16 IFGR Impeller...
Page 184: ...Parts 9 26 750 91 revised 2009 Model CB LE Packaged Boiler Manual 9 2 18 Temperature Controls...
Page 186: ...Parts 9 28 750 91 revised 2009 Model CB LE Packaged Boiler Manual W C Main Aux...
Page 193: ......
Page 194: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...