
5-34
METAL DOT MATRIX
REV. 04.2002
5 HOW TO PRODUCE ONE CARD
OPERATORS MANUAL
Fig. 5.1
3
1
2
5.0 HOW TO PRODUCE ONE CARD
Before to start with your first card you have to set
the machine, switch on the machine and run the
SWORD software.
5.1 SETTING THE MACHINE
Before to start with the production it need to
adjust the internal devices to the plates sizes to
product.
The quality and quantity of the produced plates
depend on the correct adjusting of the
mechanical units.
•
Loader
•
Unloader
•
Stamper
Open the front panel (after input the key supplied)
the METAL DOT MATRIX as shown in figure 5.1.
1. PLATES LOADER
2. STAMPING DEVICE
3. PLATES UNLOADER
It should control the state of the above mentioned
units at the begining of every work cycle.The
machine should be switched off and the power
supply should be disconnected when it is
necessary to access any of the internal parts of
the machine. The safety protection devices have
been constructed to block the machine cyle
during the adjusting phase if the preceding
standards are not respected.
REV. 05-2008
Summary of Contents for MDM 1000
Page 1: ......
Page 5: ...0 5 METAL DOT MATRIX 0 FOREWORD...
Page 6: ...0 6 METAL DOT MATRIX REV 04 2002 0 FOREWORD OPERATORS MANUAL REV 05 2008...
Page 9: ...1 9 METAL DOT MATRIX GENERAL INFORMATION 1...
Page 19: ...2 19 METAL DOT MATRIX UNPACKING 2...
Page 21: ...3 21 METAL DOT MATRIX INSTALLATION 3...
Page 27: ...4 27 METAL DOT MATRIX OVERALL DESCRIPTION 4...
Page 33: ...5 33 METAL DOT MATRIX HOW TO PRODUCE ONE CARD 5...
Page 43: ...6 43 METAL DOT MATRIX MAINTENANCE 6...
Page 47: ...7 47 METAL DOT MATRIX TROUBLESHOOTING 7...
Page 73: ...B 73 METAL DOT MATRIX HOW TO UPDATE THE FW ANNEX B...
Page 77: ...C 77 METAL DOT MATRIX LCD EDIT ANNEX C...
Page 99: ......