700 NDIR Analyzer
6-20-2017
50
Initiate Sequenced Cal
→
→
→
→
Because of timing requirements, sequenced calibrations are generally used only
when the analyzer is controlling the flow of zero and span gases into the analyzer.
To initiate a sequenced calibration, press
from the Automated Calibration menu.
A sequenced calibration has seven steps. The Current Status of each step is shown just
below the expected gas concentration (in this case, it is Purging with Sample). Each step
uses a countdown timer set up in
AutoCal Timing
, located in the Calibration Setup menu.
The sequence (with the current range indicated) is as follows:
1.
Zero Range 1 Purging
– Allows time for the zero gas to flush out any residual
gases that may still be present in the detection path.
2.
Zero Range 1 Calibrating –
The calculated zero is set as the new offset value, as
long as it is within the
Maximum Calibration Error
limits.
3.
Zero Range 1 Verifying –
The analyzer verifies that the calibrated zero value has
not deviated outside the operator-set allowable
Maximum Verifying Error
.
Analyzer Channel
Span Gas Concentration
Countdown Timer Current Date and Time
Current Status
Current Concentration
Range and Range Limit
Summary of Contents for 700 NDIR
Page 1: ...700 NDIR Analyzer 6 20 2017 1 ...
Page 32: ...700 NDIR Analyzer 6 20 2017 32 ...
Page 99: ...700 NDIR Analyzer 6 20 2017 99 Comp Factors or ...
Page 100: ...700 NDIR Analyzer 6 20 2017 100 T P Compensation H2O Compensation ...
Page 101: ...700 NDIR Analyzer 6 20 2017 101 Gas Compensation ...