6
PANEL PRO
2.
Remove the screws in the shipping tabs at the ends of the Panel Pro. A long
extension is helpful here.
3.
When unpacking or lifting the Panel Pro, take care to lift only on the square structure
on the ends, or the material mount bars mounted near the ends. Never lift or put
pressure on the lead screws or the lead screw guards.
4.
Attach leg glides (inside tool box) to legs. Set near maximum extension.
5.
Remove the shipping tabs, discard the washers, keep the screws.
6.
Have all of the 6mm leg mounting screws barely started.
7.
Attach the legs with 4 6mm socket screws each, using a 5mm Allen wrench with an
extension.
A 5mm Allen bit is included in the tool box.
Two people are required.
Stand the base unit on the end of the drain pan and have
one person support it in that position while the other
attaches the legs.
DO NOT APPLY PRESSURE TO THE
LEAD SCREW, LEAD SCREW SUPPORTS or LEAD
SCREW GUARDS!
8. Level the machine
by placing your most accurate level
on the X1 bearing rail (the aluminum extrusion deep
end of the pan). Adjust the leg glides for an exact left
to right level. Repeat on the X2 bearing rail extrusion.
Note that common levels are not sensitive enough.