17
PANEL PRO
Turning power back on after emergency or normal shut off will not cause any movement
or spindle power turn on.
Normally, turn controller power on, then open AvCAM. This enables automatic
communications once communications have been established for the first time.
See
page 19 for first time use and port set up.
Normal turn off: Close AvCAM, then turn off the controller.
CAUTION!
There should be no reason to be injured while operating the Panel Pro if a few simple
precautions and common sense are exercised.
The SC3 is powered by 110vac and switches 110vac for the coolant pump and router.
Any Drain pan leaks should be corrected before further machine use.
Operate only on a dry floor.
Test the GFCI outlet with the router running before each use. Press the test button,
and the router should stop. Press the reset button to resume operation.
Do not operate the machine if the floor in the area is wet.
If any coolant leak is noticed, immediately disconnect the power from the SC3
from a dry location and repair the leak. Make sure any area where power cords
run are dry.
Under no circumstances should the guard around the router bit be removed while the
router is running. Coolant and metal chips will fly everywhere.
Eye guards are recommended. As the milling bit performs drilling operations,
sometimes some chips can fly.
Ear protection is required.
We make no claims as to the medical properties of or continued exposure to aluminum.
It is recommended that you avoid contact with the copious chips generated by the
cutting action. The chips are sharp and can easily embed themselves in the skin.
Nitrile gloves are quite effective at keeping chips at bay.