8
PANEL PRO
14.
The Z axis is shipped in the “down” position. It will be necessary to lift it up to gain
access to the coupler clamp screw as shown. It will be quite stiff. That is normal.
15.
Install
the Z
axis
motor
with
the 4
screws. Tighten the coupler clamp screw. Make sure it is tight and does not slip.
16.
The coolant system is used on the Panel Pro consists of:
1.
submersible pump
2.
5 gallon pail
3.
modified pail lid
4.
7 ft 3/8 ID tubing
5.
¼ female npt thread to 3/8 ID hose adapter
6.
screen
7.
1 gal Koolmist
8.
Drain fitting in Panel Pro pan.
Attach 90 degree elbow (part of pump) and the hose adapter found in the same
package as the hose with the hose pointing up.